Gymnasium Addition & Renovation
Giant City CCSD No. 130
Carbondale, Illinois
hmb project no:
0508.0
cdb project no:
N/A
project status:
Under Construction

Work consists of selective demolition in the existing gymnasium and placement of backfill for new construction and renovation consisting of a new gym, entry, toilet and locker room additions. Systems include a pre-engineered metal building structure, metal roof, membrane roof, metal and masonry walls, structural steel, stud framing, windows, doors and casework. Finishes include drywall, ACT, paint, VCT and wood gym floor. Fire Protection will be new. Mechanical and Electrical work consists of demolition and new systems commensurate with the Project.

project files:
N/A
Structural Engineer:
Whiting Structural Engineers, Inc.
Civil/Mechanical/Electrical Engineer:
Asaturian Eaton and Associates P.C.